November 1st - New Floors
The hardwood floors are in and look great. Red oak, 2", 3" & 5" planks.
New chairs and tables. We still need to install the baseboards around the walls. We also need to repaint the front window.
The electrician is supposed to come out today to finish up the wiring in the bar area and in the dining area.
The plumber finished the gas line yesterday but when he performed a pressure test we found that the line was leaking. They sealed the leak around 2:00 in the afternoon and ran the test again. Another leak. At 6:00 in the evening they came back out and finally found the last leak. The pressure stayed in the line last night.
New chairs and tables. We still need to install the baseboards around the walls. We also need to repaint the front window.
The electrician is supposed to come out today to finish up the wiring in the bar area and in the dining area.
The plumber finished the gas line yesterday but when he performed a pressure test we found that the line was leaking. They sealed the leak around 2:00 in the afternoon and ran the test again. Another leak. At 6:00 in the evening they came back out and finally found the last leak. The pressure stayed in the line last night.
Everything looks great. I can't wait to see the restaurant when it's finished.
Posted by Sonia | 5:24 PM
Has the electricity come in yet?